There are four required enclosures to be included with the Sewer Lateral Inspection: 

1. DVD of sewer line inspected by a Master Plumber

2. Complete Inspection Log

3. Sketch

4. Sewer Lateral Repair Form


​A $50 fee is due to SBA before Inspection will be completed

   

ALL PLUMBING REPAIRS REQUIRE A PERMIT FROM THE BOROUGH OFFICE!!

           Schwenksville Borough Hall 610-287-7442 


Water Information

CALL BEFORE YOU DIG!!

Sewer Information